The build envelope.
PCB fabrication, PCB assembly, inspection, testing, component sourcing and manufacturing coordination, described as the envelope orders are routed within. Final limits depend on the partner factory selected for your build.
Contact the teamAssembly
Surface-mount (SMT) and through-hole (THT) assembly, including mixed-technology boards, fine-pitch and area-array packages.
Assembly capability
Reference valuesEquipment
Per partner cellFabrication
Rigid, flex, rigid-flex, HDI, RF and mixed-material boards. Values are split into Standard (routine) and Advanced (engineering review) windows.
2.1 Fabrication envelope
2.2 Board construction
2.3 Trace and space by copper weight
Minimum, outer / inner2.4 Board thickness by layer count
2.5 Drilling
2.6 Via technology
2.7 Controlled impedance
2.8 Silkscreen
2.9 Soldermask
2.10 Surface finishes
2.11 Laminate and material systems
2.12 Product types
2.13 RF and microwave
All values are editable demonstration data and are not a commitment of capability.
Design
Layout and review support that carries a design through to manufacturing outputs.
Design capability
- PCB layout support
- Multilayer design
- Digital circuits
- Analog circuits
- RF circuits
- High-density PCB design
- Stackup and impedance planning
Deliverables
- DFM review report
- DFT review report
- Gerber / ODB++ output
- NC drill and netlist
- Assembly drawings
- Pick-and-place data
- Fabrication notes
Secondary operations
- Conformal coating
- Underfill and staking
- Programming
- Box build and integration
- Labelling and serialisation
- Custom packaging
Review scope
Testing and inspection
Inspection at each stage and test coverage matched to the design.
Parts and sourcing
Components are sourced against your BOM, or supplied by you. Handling follows the same rules in both cases.
Sourcing models
Handling and traceability
Standards
Standards and qualification criteria that apply to builds. These are not claims that Integra Foundry holds any certification; partner factories are asked to evidence theirs.
Applicable standards
Status: to be verifiedNo certification is asserted for the company until independently verified and published here.
Built into the product.
Beyond the board: enclosures, heatsinks, harnesses and final test, coordinated as one order.
Send the files. We'll confirm the route.
Online quoting is not connected yet. Configure quoteUrl in lib/site.ts when the endpoint exists.
- Gerbers or ODB++
- NC drill files
- Bill of materials
- Placement data
- Fabrication drawing
- Test requirements